Housing Project

The Trees, Frome

 

Client:JCDC Developments

We provided design services to JCDC Developments to help establish the thermal performance of the property along with assisted input on appropriate MEP systems to ensure future efficiency and low-cost bills. Complexities arose regarding the two circular towers, trying to ensure consistency of insulation through curved walls in a complex timber frame structure provided its challenges. These issues were overcome during the design phase with the client and we subsequently provided Design and As Built SAP Assessments, EPC Lodgement, U-Value CalculationsPart G Water Calculations and Condensation Risk Analysis. Our client is pleased with the services that we provided on this project, and made the following comment:

There are always so many options when it comes to specifying materials that it’s nice to pin down the best alternatives with people that understand the construction methods.’

Dan Carr, Director of JCDC Developments